Honduras Design Committee

From EWBNEU_Wiki

Jump to: navigation, search

The Honduras Design Committee is currently working on Phase II of their project in El Chaguite. Our most recent Travel Team returned from Phase I implementation with more information about common water storage tanks in the area and accepted construction methods. In the near future we will be putting together a Phase II report for our return trip with this tank design included.

Contents

PROJECTS

El Tecuan

Los Planes

El Chaguite

El Carrizalito

Minutes

11-17-09

08-04-09

07-21-09

Letters

media:oct14 2009 honduras translated on letter head.jpg

media:Oct13 2009 Honduras translated.doc

Media:Honduras_letter_7.28.09.doc‎

7/21/09 - May not Travel

6/23/09 - Before August Trip

media:Chaguite_04082009.pdf

Water Board Contract

Travel Team Training

Concrete Cylinder Results - Summer 2009

Resources

Tank Design Aids and Sources

File:MixingConcreteInTheField.pdf

Capstone Presentations

EPA Emergency Disinfection Standards

ACTS

Travel

This page was last modified on 21 November 2009, at 20:26. This page has been accessed 930 times.